Contractor: Przedsiębiorstwo Budowy Dróg i Mostów Kobylarnia S.A.
Subcontractor: Budrex-Kobi Sp. z o.o. (belonging to the Unibep Group)
Completion date: VI 2013 - X 2014
Task name: Continuation of construction of A1 Motorway Toruń - Stryków, section III Brzezie - Kowal from km 186+348 to km 215+850.
Investor: General Directorate for National Roads and Motorways Branch in Białystok
Contractor: POLAQUA Sp. z o.o.
Subcontractor: Budrex Sp. z o.o. (belonging to the Unibep Group)
Task name: Extension of the national road No. 8 Warsaw - Białystok to the parameters of an expressway on the section Wyszków - border of the Podlaskie Voivodeship section II: bypass of Ostrow Mazowiecka - border of the Podlaskie Voivodeship from km 553+145.50 to km 542.07 with a length of approximately 9.40km.
[gallery ID=0]
Investor: City of Bialystok
General Contractor: Unibep SA
Contractor: Budrex Sp. z o.o. (part of Unibep Group)
Termin realizacji: w budowie
Reconstruction of Narodowe Siły Zbrojnych Street from Al. Jana Pawła II in Białystok along with technical infrastructure as part of the project: "Reconstruction of DK8 on the section from the border of the city of Białystok to the Porosły interchange (DK8) and reconstruction of DW 676 on the section from the intersection of Al. Jana Pawła II with Narodowych Sił Zbrojnych Street in Białystok (DW 676/DW669) to the Porosły interchange (DK8)-direction of traffic towards S8".
Implementation date: XII 2016 - IX 2017
Reconstruction of the road bridge over the Supraśl river in the Supraśl town at km 20+631 in the course of provincial road No. 676
The bridge structure is located over the Supraśl River, which flows through Podlaskie province and is a right-bank tributary of the Narew River. The load-bearing structure of the structure consists of steel arches with a box profile, to which is suspended a concrete deck consisting of a slab and concrete longitudinal beams resting on support cross-beams. The structure is prestressed transversely by means of non-bracing cables. Longitudinal prestressing is carried out in the longitudinal beams. The longitudinal beams are suspended from the arches using hangers in a grid pattern.
Mobile load of the bridge: class A according to PN-85/S-10030.
General contractor: SRB Civil Engineering Ltd., John Sisk&Son Ltd., Roadbridge Ltd., Budbaum S.A.
Execution date: 30.09.2010 – 14.08.2012r.
[gallery ID=0]
Nazwa realizacji: Przebudowa mostu przez rz. Pisę w m. Morgowniki wraz z dojazdami w ciągu drogi wojewódzkiej Nr 648 Miastkowo – Nowogród – Morgowniki – Korzeniste – Stawiski – Przytuły na odcinku od km 8+741 do km 8+942
Zleceniodawca: Podlaski Zarząd Dróg Wojewódzkich w Białymstoku
Generalny wykonawca: Budrex-Kobi Sp. z o. o.
Termin wykonania: 30.05.2007 – 25.07.2008r.